Site visit details

Overview

Catchment Barwon River
Site Wetland at end of Pakington st, Newtown CO_PAK001
Date and Time Monday 10th September 2018 13:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 33.42 3.6 137 7 0.14 17 12 10
Weather cloudy
Last rainfall More than a week ago 4.00
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au