Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, upstream Murray Road/Southern Road bridge, Preston/Heidelberg Heights. ME_YDA435
Date and Time Sunday 6th December 2020 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 63.17 6 970 7.9 0.01 19.3 17.7 9
Weather cloudy
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth Other:very low, about 300mm
Stream width Other:muddy near the banks
Hazards
Litter/Pollutants bottles,plastic,cans,clothing,packets,polystyrene

there were some drops of rain while we were testing and very light rain earlier in the morning

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au