Waterwatch Data Portal
ME_YDA105 Darebin Creek@ Rufus St Bridge Epping
18 June 2020
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Darebin Creek@ Rufus St Bridge Epping ME_YDA105 |
Date and Time | Thursday 18th June 2020 13:40pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 72.9 | 8 | 1480 | 8.1 | 0.05 | 20 | 11 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 9.20 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Reeds (phragmites) very thick, possibly thicker than previous observations.
Water very low - hardly flowing.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au