Waterwatch Data Portal
ME_EAR300 Ararat Creek at Princes Hwy (also known as BAC300)
24 August 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Ararat Creek at Princes Hwy (also known as BAC300) ME_EAR300 |
Date and Time | Sunday 24th August 2008 11:55am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 561 | 8.2 | 0.01 | 13.5 | 9 | 24 |
Weather | overcast |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | >2m |
Stream width | 1 |
Hazards | |
Litter/Pollutants | paper |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au