Waterwatch Data Portal
ME_MSO030 Upper Stony Creek - midpoint of capital works
27 February 2020
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Upper Stony Creek - midpoint of capital works ME_MSO030 |
Date and Time | Thursday 27th February 2020 13:30pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.07 | 42.3 | 4 | 390 | 7.4 | 0.2 | 18 | 18 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Scummy,Oily |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
Nitrate is 15mg/L using a dipstick
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au