Waterwatch Data Portal
CO_BAR040 Barwon River @ Deans Marsh-Winchelsea Rd Bridge
26 March 2021
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River @ Deans Marsh-Winchelsea Rd Bridge CO_BAR040 |
Date and Time | Friday 26th March 2021 10:55am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | eDNA presence=1 | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FAU | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 75.78 | 7.3 | 1053 | 5.8 | 0.14 | 20 | 17 | 27 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 0.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Stained brown |
Stream depth | |
Stream width | 2m - 5m |
Hazards | Long grass, traffic, difficult access |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au