Waterwatch Data Portal
ME_YMR008 Stormwater drain into Merri Creek, south of Rushall train station and just north of Queens Pde/St Georges Road Bridge, North Fitzroy
4 May 2021
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Stormwater drain into Merri Creek, south of Rushall train station and just north of Queens Pde/St Georges Road Bridge, North Fitzroy ME_YMR008 |
Date and Time | Tuesday 4th May 2021 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample | 310 | 8.3 | 15.7 | 19 | 9 |
Weather | raining |
---|---|
Last rainfall | Raining now 10.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear,Foamy/frothy |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
Drain flowing quite well, enough for a sample to be collected after heavy rainfall over last 2 days. Water testing completed with Collingwood College Year 7 students.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au