Site visit details

Overview

Catchment Loddon River
Site Bendigo Creek, end of Elm St Golden Square NC_BGO021
Date and Time Monday 30th November 2020 16:40pm
Approved Approved

Notes

Physical Chemical Tests

D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 3940 7.6 0.15 30 26 9
Weather sunny
Last rainfall More than a week ago 20.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants bottles,paper,plastic,packets

Cumbungi is closing out the site and a sand/rock bar has formed at the site and split the pool i normally sample from the main channel and it is now filling in with cumbungi.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au