Site visit details

Overview

Catchment Latrobe River
Site Middle Creek at Martin Walker Reserve Yinnar South WG_MID060
Date and Time Saturday 3rd July 2021 14:45pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 250 7.1 0.015 12.7 9.2 5
Weather cloudy
Last rainfall During the last 24 hours 1.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Milky,Stained green
Stream depth Other:
Stream width Other:
Hazards
Litter/Pollutants

1st return after major flooding event.

Complete restructuring of the river embankments. Flood has carved out a new deep waterhole. Many Manna Gums brought down.

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Poor 2 VeryPoor 2 N/A N/A N/A 4

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au