Site visit details

Overview

Catchment Bunyip River
Site Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300
Date and Time Tuesday 22nd June 2021 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 70.95 8 1050 8.6 0 14 9.9 9
Weather overcast
Last rainfall During the last 24 hours 5.00
Flow estimate
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards soft mud and slippery
Litter/Pollutants

large amount of weeds and reeds  growing. water level low.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au