Site visit details

Overview

Catchment Lake Victoria
Site Forge Creek, corner bend - Site 2 EG_FOR040
Date and Time Monday 30th August 2021 09:57am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 140 7.2 0.01 12.3 11.5 9
Weather sunny
Last rainfall During the last week 49.60
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au