Site visit details

Overview

Catchment Broken River
Site Stoney Creek at boundary to Lima Pine Plantation GB_SNY003
Date and Time Sunday 6th February 2022 16:45pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 100 7.5 0 21.6 9
Weather sunny
Last rainfall During the last week 5.50
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants

Hancocks did aerial  [ helicopter ] granular  fertilising in the upper catchment area late last year. After the heavy rains we have had, could be some run off causing some of the higher readings.

 

 

I am running low on on the 1413 conductivity  calibration solution. Damien Gerrands in the Lima east catchment is also running low.

I'm OK for the moment with the pH test solutions.

Thanks.  Kevin Smith

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au