Waterwatch Data Portal
GB_SNY003 Stoney Creek at boundary to Lima Pine Plantation
6 February 2022
Overview
Catchment | Broken River |
---|---|
Site | Stoney Creek at boundary to Lima Pine Plantation GB_SNY003 |
Date and Time | Sunday 6th February 2022 16:45pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 100 | 7.5 | 0 | 21.6 | 9 |
Weather | sunny |
---|---|
Last rainfall | During the last week 5.50 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
Hancocks did aerial [ helicopter ] granular fertilising in the upper catchment area late last year. After the heavy rains we have had, could be some run off causing some of the higher readings.
I am running low on on the 1413 conductivity calibration solution. Damien Gerrands in the Lima east catchment is also running low.
I'm OK for the moment with the pH test solutions.
Thanks. Kevin Smith