Waterwatch Data Portal
NC_COL200 Coliban River, Manning Bridge, Springhill Road Tylden
1 March 2022
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Coliban River, Manning Bridge, Springhill Road Tylden NC_COL200 |
Date and Time | Tuesday 1st March 2022 10:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 101 | 7.7 | 0.02 | 18 | 9 | 15 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | Other:.2m |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au