Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha ME_EBA800
Date and Time Sunday 3rd April 2022 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 95 9 985 6.7 0.15 18.5 15.8 10
Weather raining
Last rainfall Raining now 0.50
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au