Site visit details

Overview

Catchment Yarra River
Site Mullum Mullum Creek - Yarran Dheran Resv, off Beckett Rd. ME_YML045
Date and Time Tuesday 26th April 2022 09:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 78.03 8.4 350 0 7.2 0.013 11 12 14
Weather sunny
Last rainfall During the last week 46.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Other
Stream depth
Stream width
Hazards
Litter/Pollutants plastic,waxed cardboard,cans,other: disintegrating plastic laundry basket

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au