Site visit details

Overview

Catchment Yarra River
Site Reedy Billabong East ME_YYR808
Date and Time Friday 18th November 2011 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.51 1.1 430 6.3 0.36 25 19 29 9
Weather sunny
Last rainfall During the last week 12
Flow estimate PERMANENT: wetlands and lakes
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 50
Hazards
Litter/Pollutants
Duckweed dispersed across water, 10% cover.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au