Waterwatch Data Portal
CO_BEMPP4 Barwon River Team B Talbot (BEMPP4)
21 April 2021
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River Team B Talbot (BEMPP4) CO_BEMPP4 |
Date and Time | Wednesday 21st April 2021 11:40am |
Approved | Approved |
Physical Chemical Tests
Ammo mg/l | N mg/L NH4+ | pH pH Units | Coli orgs/100mL | Turb NTU | |
---|---|---|---|---|---|
Sample | 0 | 7.5 | 10 | 9 |
Weather | |
---|---|
Last rainfall | During the last 24 hours 4.00 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Visual Discharge: Yes Odour : Yes (bad)
Tide getting lower beach sample. Channeling from urban edge sending a trickle of water to the Estuary.
L:11.26AM H:5.46PM
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au