Waterwatch Data Portal
CO_BEMPP4 Barwon River Team B Talbot (BEMPP4)
30 September 2021
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River Team B Talbot (BEMPP4) CO_BEMPP4 |
Date and Time | Thursday 30th September 2021 09:55am |
Approved | Approved |
Physical Chemical Tests
Ammo mg/l | N mg/L NH4+ | pH pH Units | Coli orgs/100mL | Turb NTU | |
---|---|---|---|---|---|
Sample | 0 | 7.6 | 31 | 9 |
Weather | |
---|---|
Last rainfall | During the last 24 hours 5.80 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Visual Discharge: None Odour:None
Sample collected in close proximity to drain, at opening end.
L:11.24AM H:5.04PM
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au