Waterwatch Data Portal
ME_EBI100 Bittern Dam, near dam wall and catch drain
21 June 2022
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern Dam, near dam wall and catch drain ME_EBI100 |
Date and Time | Tuesday 21st June 2022 09:45am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 75.6 | 8 | 2800 | 8.2 | 0 | 13.5 | 12.4 | 9 |
Weather | raining |
---|---|
Last rainfall | 5.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Foamy/frothy,Muddy |
Stream depth | 1m - 2m |
Stream width | > 5m |
Hazards | slippery banks soft mud |
Litter/Pollutants | bottles,polystyrene |
water level up .major pipe upgrades nearby.no water birds .
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au