Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Tuesday 21st June 2022 09:45am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 75.6 8 2800 8.2 0 13.5 12.4 9
Weather raining
Last rainfall 5.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Foamy/frothy,Muddy
Stream depth 1m - 2m
Stream width > 5m
Hazards slippery banks soft mud
Litter/Pollutants bottles,polystyrene

water level up .major pipe upgrades nearby.no water birds .

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Good 4 Good 8 N/A N/A Good 8 20

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au