Site visit details

Overview

Catchment Loddon River
Site Bullock Creek, Upper Spring Ck Landcare, B6 NC_BUL140
Date and Time Wednesday 7th September 2022 11:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1610 7.3 0.05 14 10 10
Weather cloudy
Last rainfall During the last week 34.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown,Muddy
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards none
Litter/Pollutants

There appeared to be a possible blockage of the main flow pipe under the roadway, causing all the water to flow over the road.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au