Waterwatch Data Portal
ME_MSO010 Upper Stony Creek - upstream of capital works
23 March 2022
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Upper Stony Creek - upstream of capital works ME_MSO010 |
Date and Time | Wednesday 23rd March 2022 10:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.25 | 65 | 6 | 330 | 10 | 7.5 | 0.25 | 16.3 | 19.2 | 20 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Scummy,Smelly,Oily |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,oil,paper,plastic,waxed cardboard,cans,clothing,packets,petrol//diesel,polystyrene,other: masks |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au