Site visit details

Overview

Catchment Maribyrnong River
Site Upper Stony Creek - upstream of capital works ME_MSO010
Date and Time Wednesday 18th May 2022 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 85 8 200 0 8.2 0.07 13.7 15.8 10
Weather cloudy
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Scummy,Smelly,Stained brown,Oily
Stream depth 0 - 50cm
Stream width > 5m
Hazards
Litter/Pollutants bottles,oil,waxed cardboard,cans,packets,petrol//diesel

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Poor 2 VeryPoor 2 VeryPoor 2 VeryPoor 1 VeryPoor 2 9

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au