Site visit details

Overview

Catchment Maribyrnong River
Site Upper Stony Creek - midpoint of capital works ME_MSO030
Date and Time Wednesday 19th October 2022 11:20am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.1 60.92 6 720 10 7.5 0.4 19.6 16 10
Weather sunny
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Scummy,Smelly
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,paper,plastic,waxed cardboard,cans,packets,petrol//diesel,polystyrene

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Good 4 Fair 6 Fair 6 Fair 3 Fair 6 25

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au