Waterwatch Data Portal
ME_MSO030 Upper Stony Creek - midpoint of capital works
19 October 2022
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Upper Stony Creek - midpoint of capital works ME_MSO030 |
Date and Time | Wednesday 19th October 2022 11:20am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.1 | 60.92 | 6 | 720 | 10 | 7.5 | 0.4 | 19.6 | 16 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Scummy,Smelly |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets,petrol//diesel,polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au