Waterwatch Data Portal
ME_YSC012 Glen Waverley Main Drain. Behind 5/6 Crosby Drive, Glen Waverley
19 March 2023
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Glen Waverley Main Drain. Behind 5/6 Crosby Drive, Glen Waverley ME_YSC012 |
Date and Time | Sunday 19th March 2023 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 90 | 16.5 | 16 | 5 |
Weather | overcast |
---|---|
Last rainfall | During the last week 1.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | bottles,paper,waxed cardboard |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au