Site visit details

Overview

Catchment Werribee River
Site D1 Drain, 150 metres from Chat Place, Hoppers Crossing/Werribee. ME_WDD050
Date and Time Thursday 18th May 2023 12:00pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 27.54 3 204 7.5 0.07 16.3 11.5 9
Weather cloudy
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants cans,packets

The DO for the last 2 visits has been very low. Suggest installation of riffle section wihen the drain is renovated

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au