Waterwatch Data Portal
NC_BUL120 Bullock Creek: Upper Spring Ck Landcare, B3
9 June 2023
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120 |
Date and Time | Friday 9th June 2023 10:00am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 1170 | 7.5 | 0.02 | 13.5 | 10.5 | 40 |
Weather | sunny |
---|---|
Last rainfall | During the last week 61.50 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown,Muddy |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | long grass |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets,polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au