Site visit details

Overview

Catchment Loddon River
Site Bullock Creek: Upper Spring Ck Landcare, B10 NC_BUL180
Date and Time Friday 9th June 2023 11:30am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1280 7.4 0.1 9.5 11 70
Weather sunny
Last rainfall During the last week 61.50
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown,Muddy
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards wet ground
Litter/Pollutants

Water was observed flowing in the channel 500m north of Stewarts Lane. Samples were taken and the follwing results obtained: Reactive phosphate =1.00mg/L : Conductivity= 1160uS/cm : pH =7.3 : Turbidity = 50NTU.

Photo,DSCN0571 is attached, showing the water flowing in this channel.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au