Waterwatch Data Portal
ME_YML045 Mullum Mullum Creek - Yarran Dheran Resv, off Beckett Rd.
22 August 2023
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Mullum Mullum Creek - Yarran Dheran Resv, off Beckett Rd. ME_YML045 |
Date and Time | Tuesday 22nd August 2023 09:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.01 | 82.65 | 9 | 330 | 0 | 7.5 | 0.05 | 14 | 11.5 | 17 |
Weather | overcast |
---|---|
Last rainfall | During the last week 13.20 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,cans |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au