Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury ME_YDA485
Date and Time Sunday 10th September 2023 08:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 93.66 10 810 7.2 0.07 12.2 12.3 9
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,plastic,cans,packets

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au