Waterwatch Data Portal
NC_LIT005 Little Coliban River, Rippers Lane
18 September 2023
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Little Coliban River, Rippers Lane NC_LIT005 |
Date and Time | Monday 18th September 2023 12:20pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 234 | 8.8 | 0 | 20 | 10.8 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 0.10 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear,Stained brown |
Stream depth | 51cm - 99cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
changed testing site to downstream, (flow from the bridge underpass) see image attached. possibly due to higher and faster running flow than usual. may not be suitable for testing ihere n the summer (low flows). however will test here from now on unless advised otherwise.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au