Site visit details

Overview

Catchment Campaspe River
Site Little Coliban River, Rippers Lane NC_LIT005
Date and Time Monday 18th September 2023 12:20pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 234 8.8 0 20 10.8
Weather overcast
Last rainfall More than a week ago 0.10
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Stained brown
Stream depth 51cm - 99cm
Stream width < 2m
Hazards
Litter/Pollutants

changed testing site to downstream, (flow from the bridge underpass) see image attached. possibly due to higher and faster running flow than usual. may not be suitable for testing ihere n the summer (low flows). however will test here from now on unless advised otherwise.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au