Site visit details

Overview

Catchment Loddon River
Site Birch's Creek - pool 240m downstream from dam wall NC_BIR110
Date and Time Tuesday 21st March 2023 11:15am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 200 7.3 0 17.3 16.6 9
Weather overcast
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained green
Stream depth Other:
Stream width > 5m
Hazards Has been heavy earthmover fire upstream from collection site. Earth channel dug all around the heavy vehicle which is still on site. I don't know what escaped prior to management. Area cordoned off around earth mover. Fire caught extremely quickly, small area burned around it. Earthmover is stuffed. See photos.
Litter/Pollutants

Large earthmover fire and equipment still on site just upstream from collection site. Earth channel dug around the equipment. Cordoned off. Don't know if anyone reported fuel or anything into creek. See photo. Unfortunately it turns out most of my waterwatch photos for this visit weren't saved.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au