Site visit details

Overview

Catchment Goulburn River
Site Hughes Creek at Booroola Estate GB_HUG013
Date and Time Thursday 5th October 2023 12:35pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Air ° C Water ° C Turb NTU
Sample 104 7.3 12.3 81
Weather overcast
Last rainfall During the last week
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy
Stream depth 1m - 2m
Stream width > 5m
Hazards
Litter/Pollutants

We did 3 tests from the same sample for EC, as it was much lower than last month. The 3 test results were 111, 101 and 104, so we took the last test as the result. We can only assume EC is much lower because salt concentration was reduced by the significant rains and water flow in the last 2 days.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au