Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Wednesday 8th November 2023 11:25am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 0.07 87.04 8.1 1620 7 0.03 23.5 18.6 15.5
Weather sunny
Last rainfall During the last 24 hours 10.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,plastic,packets,polystyrene

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au