Waterwatch Data Portal
ME_YDA485 Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury
12 November 2023
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury ME_YDA485 |
Date and Time | Sunday 12th November 2023 07:41am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0.15 | 97.19 | 9 | 1890 | 8.1 | 0.1 | 15.6 | 18.8 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | plastic,packets |
Ammonia high repeated test to check that it wasn't human error, still high compared to usual.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au