Waterwatch Data Portal
ME_EDV300 Devilbend Reservoir, western tip, accessible by 2wd track
22 August 2023
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300 |
Date and Time | Tuesday 22nd August 2023 10:30am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 59.14 | 6 | 841 | 6.7 | 0.01 | 13 | 14.6 | 9 |
Weather | cloudy |
---|---|
Last rainfall | Raining now 5.00 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Stained brown |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | soft mud. track flooded slippery |
Litter/Pollutants |
track still flooded.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au