Waterwatch Data Portal
WG_MID060 Middle Creek at Martin Walker Reserve Yinnar South
4 December 2023
Site visit details
Overview
Catchment | Latrobe River |
---|---|
Site | Middle Creek at Martin Walker Reserve Yinnar South WG_MID060 |
Date and Time | Monday 4th December 2023 10:15am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 210 | 7.1 | 0.015 | 21.3 | 14.5 | 31 |
Weather | sunny |
---|---|
Last rainfall | During the last week 45.00 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 2m |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
Significant rain in the up-stream catchment ealier in the week.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au