Waterwatch Data Portal
Site visit details
Overview
Catchment | Hopkins River |
---|---|
Site | Mount Emu Creek @ Skipton CO_MEC070 |
Date and Time | Saturday 16th September 2023 08:30am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 6240 | 7.5 | 0.05 | 14 | 12 | 35 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 2.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 2m |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
Very muddy, very wet, lots of rain over last month
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au