Waterwatch Data Portal
Site visit details
Overview
Catchment | Ovens River |
---|---|
Site | Mullinmur Billabong Pond 1 NE_MUL002 |
Date and Time | Friday 19th January 2024 13:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 100.47 | 8.3 | 80 | 6.9 | 0.01 | 25 | 32 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Sunny day, no wind. Some red growth. Noticed when dragging sample bucket thata fine green 'sediment' was stirred up. Tried to avoid when sampling.
Noted Dissolved oxygen was very different to the adjacent billabong. This was noticeable immediately after adding chemicals with strong colour and precipitateformation. Sodium thiosulfate not added until all precipiate removed.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au