Waterwatch Data Portal
CO_CNA100 Coronae Dr easement drain @ foreshore, Edgewater Dr, Clifton Springs
4 March 2024
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Coronae Dr easement drain @ foreshore, Edgewater Dr, Clifton Springs CO_CNA100 |
Date and Time | Monday 4th March 2024 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 90.9 | 9 | 5520 | 8.1 | 0.26 | 20 | 15 | 10 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained green |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
No litter pollutants observed one day after Clean-Up Australia Day (3 March) rubbish collection along the foreshore.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au