Waterwatch Data Portal
ME_YDA485 Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury
10 March 2024
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury ME_YDA485 |
Date and Time | Sunday 10th March 2024 08:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 70.69 | 6 | 2300 | 6.9 | 0.06 | 26.8 | 23.2 | 9 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au