Waterwatch Data Portal
ME_MSO030 Upper Stony Creek - midpoint of capital works
14 September 2023
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Upper Stony Creek - midpoint of capital works ME_MSO030 |
Date and Time | Thursday 14th September 2023 13:30pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.06 | 37.49 | 214.8 | 0.25 | 6.78 | 0.193 | 23.9 | 15 | 22.6 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au