Site visit details

Overview

Catchment Barwon River
Site Coronae Dr easement drain @ foreshore, Edgewater Dr, Clifton Springs CO_CNA100
Date and Time Monday 8th April 2024 11:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 69.37 6.75 4400 8 0.5 19 16 10
Weather sunny
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards Nil
Litter/Pollutants

Reactive phosphate result was obtained from diluted sample (1:2 in distilled water) as undiluted sample was outside measuring range. Diluted sample measured 0.25, calculated x2 = 0.5

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au