Site visit details

Overview

Catchment Mitchell River
Site Macleod Morass - Outlet EG_MOR090
Date and Time Sunday 7th July 2024 14:35pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Temp DIff ° C P mg/L Turb NTU
Sample 2340 7.3 0.2 12.8 9.2 10
Weather overcast
Last rainfall During the last week 15.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Scummy
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au