Waterwatch Data Portal
NC_BUL140 Bullock Creek, Upper Spring Ck Landcare, B6
3 August 2024
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bullock Creek, Upper Spring Ck Landcare, B6 NC_BUL140 |
Date and Time | Saturday 3rd August 2024 10:00am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 5900 | 6.8 | 0.02 | 9.5 | 7.5 | 9 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago 5.00 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Scummy,Stained brown,Oily |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | none |
Litter/Pollutants |
There was only a very small flow coming through the pipe under the ford. Photo DSCN1236 shows this.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au