Site visit details

Overview

Catchment Mitchell River
Site Macleod Morass - Outlet EG_MOR090
Date and Time Monday 19th August 2024 16:15pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Temp DIff ° C P mg/L Turb NTU
Sample 1835 7.35 0.18 18.6 14.1 30
Weather sunny
Last rainfall During the last week 7.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth 2m
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au