Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek at Halsalls Lane GB_CRE020
Date and Time Saturday 10th August 2024 13:20pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 118 7.3 0 17.4 11.2 9
Weather sunny
Last rainfall During the last week 0.50
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au