Waterwatch Data Portal
NC_AXE050 Axe Creek @ bottom of Contribution Creek
30 April 2012
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Axe Creek @ bottom of Contribution Creek NC_AXE050 |
Date and Time | Monday 30th April 2012 11:00am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 770 | 7.5 | 0.05 | 14 | 10 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au