Site visit details

Overview

Catchment Goulburn River
Site Dabyminga Creek at Ennis Road Ford GB_DAB015
Date and Time Sunday 22nd April 2012 15:20pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 97 9.2 560 7.4 1 18.4 3.7
Weather raining
Last rainfall Raining Now 0.6
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width
Hazards
Litter/Pollutants
Slow flow

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au