Site visit details

Overview

Catchment Campaspe River
Site Five Mile Creek Scouts Billabong NC_FMC530
Date and Time Friday 1st June 2012 16:30pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 310 7 0.1 9.5 8.5 9
Weather sunny
Last rainfall More than a week ago 40
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
PH Meter not available. PH measured with test strips.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au