Waterwatch Data Portal
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Five Mile Creek Scouts Billabong NC_FMC530 |
Date and Time | Friday 1st June 2012 16:30pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 310 | 7 | 0.1 | 9.5 | 8.5 | 9 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 40 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
PH Meter not available. PH measured with test strips.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au