Waterwatch Data Portal
ME_DBC250 Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby.
24 February 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250 |
Date and Time | Friday 24th February 2012 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 550 | 7.2 | 0.08 | 29 | 19.1 | 20 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 25 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Other: cloudy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
dissolved oxygen chemicals out of date
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au